ANNUAL WATER MAIN REPLACEMENT PROJECT
For the month of September, the contractor will continue installation of new water main on 2nd Street between Hill Street and Ashland Ave; testing and connecting the newly installed water main on 6th St between Ocean Park Blvd and Pier Ave and Raymond Ave between 4th Street and 6th Street and installation of meter boxes on 18th Court between Delaware Ave and Pico Blvd; Traffic on 18th Court, 6th Street, Raymond Ave, and 2nd Street will be closed to through traffic. Please use alternate routes whenever possible. If you have any questions or concerns, please contact Carlos Rosales at carlos.rosales@smgov.net or (310) 458-2201, x2620.
ADVANCED TRAFFIC MANAGEMENT SYSTEM, PHASE 5 PROJECT
For the month of September, this project will upgrade the traffic signal equipment at four locations and install fiber optic cables along Montana Ave and 26th St.; The project will provide transit priority along the corridor, allow for real-time remote monitoring and management of the traffic signals, provide public Wi-Fi along the corridor, and connect the San Vicente Reservoir and the Montana Avenue Branch Library to the City’s network. We appreciate your patience during the project, to provide this safety improvement and public enhancements. If you have any questions or concerns, please contact Jay Dinkins at jay.dinkins@smgov.net or (310) 458-8291.
CITY YARDS MODERNIZATION PROJECT
For the month of September, construction will impact the project area located at 2500 Michigan Ave, which will affect the sidewalk and parking lane on the north side of Delaware Ave just east of 24th St. Please contact Senior Construction Manager Sebastian Felbeck at sebastian.felbeck@smgov.net or (310) 434-2675 with any questions/concerns regarding this project.
SUSTAINABLE WATER INFRASTRUCTURE PROJECT (SWIP) Underground Work
For the month of September, from 7/22/21 - 9/30/21, underground pipeline work on Main Street between Pico Blvd and Olympic Drive.
1. Expect delays on northbound and southbound Main St. from Pico Blvd. to Olympic Dr.
2. Temporary loss of 4 metered parking stalls on northbound Main St.
3. Temporary loss of sidewalk on northbound Main St, please follow detour signs and cross at designated crossings.
For questions or inquiries, please contact Jason Hoang, Construction Manager, at jason.hoang@santamonica.gov or (310) 351-7913.
PEDESTRIAN IMPROVEMENTS AT 4 SCHOOLS PROJECT
During the month of September, this construction project will include installation of centerline delineators, on 16th St, between California Ave & Washington Ave and on 16th St between Pearl St and Maple St. Minimal parking impacts where Temporary No Parking signs are posted. Please use alternate routes when possible. If you have any questions or concerns, please contact Saad Malim at saad.malim@smgov.net or (310) 458-2201, x5048.
ALLEY RENEWAL PROGRAM
For the month of September through December, Street Maintenance Crews will begin alley repair work as part of the Alley Renewal Program in the 200 Blk of 16th Court. The scope of this work involves alley resurfacing and water box upgrade. This project is citywide and will involve repairs across multiple locations from 8 a.m. to 3:30 p.m. Please use alternate routes whenever possible. If you have any questions or concerns, please contact Tyler Brown at tyler.brown@smgov.net or (310) 458-8212.
NON-POTABLE WATER MAIN PROJECT
For the month of September, the contractor will be connecting the newly installed non-potable water main on Ocean Ave, Olympic Drive and Main Street. The contractor will maintain one lane of traffic in each direction on Ocean Avenue, Olympic Drive and Main Street. Please use alternate routes whenever possible. If you have any questions or concerns, please contact Carlos Rosales at carlos.rosales@smgov.net or (310) 458-2201, x2620.
ANNUAL PAVING AND SIDEWALK REPAIR PROJECT
For the month of September, starting 9/24/21, the contractor Excel Paving will resurface asphalt paving on City streets listed below. Due to reduced traffic lanes, please expect delays. One-lane traffic in each direction will be maintained. Street parking will not be available. This work will take approximately 4-5 weeks.
Street pavement resurfacing segments are:
- 4th Street between Palisades Ave and Wilshire Blvd.
- 6th Street between Montana Ave and Wilshire Blvd.
- Neilson Way between Pico Blvd. and Pacific Ave.
- Pico Blvd. between 16th St and Ocean Ave.
- 23rd Street between Ocean Park Blvd. and Airport Ave.
Please use alternate routes whenever possible. If you have any questions or concerns, please contact Selim Eren at selim.eren@smgov.net or (310) 458-2201 x5701.