(File photo)

(File photo)

Expo Light Rail Line Project 

 

Note the following activities:

1. Colorado Avenue eastbound between Fourth and Fifth streets is set to close on February 18, 2013. Detailed information can be found online at: www.buildexpo.org.

2. Colorado Avenue between Second and 10th streets and between 14th and17th streets: Expect westbound and eastbound lane closures during the nighttime hours of 9 p.m. and 6 a.m. and daytime hours. Expect reduction of travel lanes on Fifth Street at Colorado.

3. Olympic Boulevard between 20th Street and Cloverfield Boulevard: Expect westbound and eastbound delays and lane closures during non-peak travel hours 9:30 a.m. — 3 p.m.

4. Lincoln Boulevard between Broadway and I-10 Freeway: Expect a partial closure at the intersection of Lincoln Boulevard and Colorado Avenue during the nighttime hours of 9 p.m. — 6 a.m.).  Northbound and southbound traffic lanes will be reduced during nighttime hours only.

Additional information is available at: www.buildexpo.org. For more information about the Expo Line project, visit BuildExpo.org or call (213) 922-EXPO (3976).

 

Parking Structure No. 6 

 

There will be periodic sidewalk closures on Second Street between Broadway and Santa Monica Boulevard through Feb. 9.  There will be periodic northbound lane closures thru Feb. 9 for materials deliveries on Second Street between Broadway and Santa Monica Boulevard. Temporary traffic control signs and barricades will be deployed to guide vehicular and pedestrian traffic in and around the work areas.  Fencing and deliveries work will take place in the alley behind the parking structure (Second Court), with partial alley closures taking place through Feb. 9. All work will take place Monday through Friday, 8 a.m. — 5 p.m. For more information about the Parking Structure 6 project, visit www.SMConstructs.org or call (310) 458-2205.

 

Civic Center Parks

 

Through March of 2103 the majority of Town Square (front yard of City Hall) will be closed so the contractor can continue construction activities. During this time period, the west facing front door of City Hall will be accessible via a pedestrian pathway that runs north from the sidewalk on Olympic Drive to the front door of City Hall.  The sidewalk and parking lane on the east side of Main Street will be closed in front of City Hall; The parking lot and City Hall entrance on the north side of City Hall will remain open during construction.  One-way vehicular traffic has been implemented turning west from Main Street on to Fujinomiya Douri; traffic must exit behind City Hall south on Avenida Mazatlan and onto Olympic Drive. Caution should be used in this area, emergency vehicles are exempt from the one-way traffic pattern.

 

Ocean Park Boulevard Complete Green Street Project 

 

Minor construction work and installation of the new bike lane will take place Tuesday to Friday, 8 a.m. to 6 p.m., on Ocean Park Boulevard between Barnard Way and Lincoln Boulevard. Traffic control will be in place during construction. For more info, go to: www.SMConstructs.org. Please use alternate routes whenever possible.

 

20th Street, Cloverfield Boulevard Improvement Project 

 

Construction activities will take place on 20th and Cloverfield which will involve lane closures between the hours of 8 a.m. — 6 p.m. Traffic control will be in place during construction and will maintain one lane of traffic in each direction at all times. Impact to traffic should be minimal. For more info, please contact Jim Litzel, Black & Veatch, (310) 863-4991.

 

Santa Monica-Malibu USD: Lincoln Middle School

 

Beginning on Monday, 14th Street between California and Washington avenues will have fencing installed in the northbound lane. The center turning lane will be used by northbound traffic. The southbound lane will remain open.

 

430 Pico Blvd.

 

Sidewalk, parking lane, and southern traffic lane are closed. For more information, contact Kyle Anderson at (310) 399-1600, ext. 227.